Resource-Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations
成果类型:
Article
署名作者:
Ballestin, Francisco; Leus, Roel
署名单位:
Universidad Publica de Navarra; KU Leuven
刊物名称:
PRODUCTION AND OPERATIONS MANAGEMENT
ISSN/ISSBN:
1059-1478
DOI:
10.1111/j.1937-5956.2009.01023.x
发表日期:
2009
页码:
459-474
关键词:
project scheduling
resource constraints
uncertainty
stochastic activity durations
GRASP
摘要:
We investigate resource-constrained project scheduling with stochastic activity durations. Various objective functions related to timely project completion are examined, as well as the correlation between these objectives. We develop a GRASP-heuristic to produce high-quality solutions, using so-called descriptive sampling. The algorithm outperforms existing algorithms for expected-makespan minimization. The distribution of the possible makespan realizations for a given scheduling policy is also studied.