Investment and time to plan and build: A comparison of structures vs. equipment in a panel of Italian firms

成果类型:
Article
署名作者:
Del Boca, Alessandra; Galeotti, Marzio; Himmelberg, Charles P.; Rota, Paola
署名单位:
University of Brescia; University of Milan
刊物名称:
JOURNAL OF THE EUROPEAN ECONOMIC ASSOCIATION
ISSN/ISSBN:
1542-4766
DOI:
10.1162/JEEA.2008.6.4.864
发表日期:
2008
页码:
864-889
关键词:
to-build aggregate fluctuations delivery lags capital goods models persistence demand
摘要:
Time-to-build models of investment expenditures play an important role in many traditional and modem theories of the business cycle, especially for explaining the dynamic propagation of shocks. We estimate the structural parameters of a time-to-build model using annual firm-level investment data on equipment and structures. For expenditures on equipment, we find no evidence of time-to-build effects beyond one year. For expenditures on structures, by contrast, there is clear evidence of such effects in the range of two to three years. The contrast between equipment and structures is intuitively reasonable and consistent with previous results. The estimates for structures also indicate that initial-period expenditures are low and increase as projects near completion. These results provide empirical support for including time-to-plan effects for investment in structures. More generally, these results suggest a potential source of specification error for Q models of investment and production-based asset pricing models that ignore the time required to plan, build, and install new capital.
来源URL: