Additionality of Carbon Offsets: Project-Specific vs. Standardized Baselines

成果类型:
Article; Early Access
署名作者:
V. Agrawal, Vishal; Chakraborty, Soudipta; Yucel, Safak
署名单位:
Georgetown University; University of Kansas
刊物名称:
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT
ISSN/ISSBN:
1523-4614
DOI:
10.1287/msom.2025.0755
发表日期:
2026
关键词:
Renewable Energy emissions policies IMPACT
摘要:
Problem definition: Developers generate carbon offsets by investing in emissions-reduction projects to receive two sources of revenue: project revenue, for example, from the electricity sold in a renewable energy project, and offset revenue based on offsets issued by a nonprofit carbon registry. The registry ensures additionality, that is, the offset should represent one unit of reduction from the developer's business-as-usual emissions: what the developer's emissions would have been without the offset revenue. Although environmental groups raise greenwashing concerns against nonadditional offsets, ensuring additionality is challenging because it requires assessing project revenue, which is the developer's private information. In practice, the registry assigns a baseline to represent business-as-usual emissions through one of the two methods: Under the projectspecific method, a developer self-reports its business-as-usual emissions to the registry, which then inspects the report and assigns reported emissions as the baseline if it accepts the project. Under the standardized method, the registry assigns a common baseline to a group of similar projects. It is unclear which method leads to fewer nonadditional offsets and greater reduction in emissions and should be chosen by a registry. Methodology/ results: We analyze these economic and environmental implications by developing a sequential game between a registry and project developers. Managerial implications: We find that project-specific baselines may lead to fewer nonadditional offsets but lower emissions reduction, cautioning environmental groups against simply advocating for the method that leads to fewer nonadditional offsets. We also find that a registry may prefer project-specific baselines even when they result in more nonadditional offsets. Finally, we find that a registry's preference between the two methods is typically consistent with a corporate buyer's.