Erratum to Competitive Two-Agent Scheduling and Its Applications

成果类型:
Correction
署名作者:
Koulamas, Christos; Kyparisis, George; Pinedo, Michael; Wan, Guohua
署名单位:
State University System of Florida; Florida International University; New York University; Shanghai Jiao Tong University
刊物名称:
OPERATIONS RESEARCH
ISSN/ISSBN:
0030-364X
DOI:
10.1287/opre.2023.0368
发表日期:
2024
页码:
1749-1750
关键词:
摘要:
Leung et al. (2010) [Leung JY-T, Pinedo M, Wan G (2010) Competitive two-agent scheduling and its applications. Oper. Res. 58:458-469] considered a two-agent nonpreemp-tive single-machine scheduling problem. Agent A is responsible for n1 jobs with due dates d1,...,dn and has as the objective the minimization of the total tardiness of the n1 jobs. Agent B is responsible for n2 jobs and has as the objective the minimization of the total completion time of the n2 jobs. The problem is to find a schedule for the n1 + n2 jobs that minimizes the objective of agent A (with regard to his n1 jobs) while keeping the objective of agent B (with regard to his n2 jobs) below or at a fixed level Q. Leung et al. (2010) [Leung JY-T, Pinedo M, Wan G (2010) Competitive two-agent scheduling and its applications. Oper. Res. 58:458-469], in their theorem 3, showed that this problem can be solved through dynamic programming in pseudopolynomial time. However, in the proof of their theorem and in their dynamic programming formulation, there is an error that requires some changes in their proof.
来源URL: