OPTIMAL OPERATING POLICY FOR A BOTTLENECK WITH RANDOM REWORK
成果类型:
Article
署名作者:
SO, KC; TANG, CS
署名单位:
University of California System; University of California Los Angeles
刊物名称:
MANAGEMENT SCIENCE
ISSN/ISSBN:
0025-1909
DOI:
10.1287/mnsc.41.4.620
发表日期:
1995
页码:
620-636
关键词:
BOTTLENECK WITH REWORK
OPTIMAL OPERATING POLICY
threshold policy
semi-Markov decision process
摘要:
This paper presents a model of a bottleneck facility that performs two distinct types of operations: ''regular'' and ''rework.'' Each job is subjected to a test after completing the regular operation at the bottleneck. If the job passes the test, then it continues its process downstream. Otherwise, the job will cycle back to the bottleneck stage for rework operation. Upon the completion of a batch of regular jobs, Me decision maker observes the amount of rework and decides on whether to switch over to process the reworks or continue to process another batch of regular jobs. It is assumed that both switch-over time and cost are incurred when the facility switches from performing one type of operation to a different type. The goal of the analysis is to characterize Me optimal operating policy for the bottleneck so that the average operating cost is minimized. In order to characterize the optimal operating policy, we first formulate the problem as a semi-Markov decision process. Then we show that there exists an optimal ''threshold'' operating policy that can be described as follows: upon completion of a batch of regular jobs, switch over to process the reworks only if the number of reworks exceeds a critical value. In addition, we develop a simple procedure to compute the critical value that specifies the optimal threshold policy. Moreover, we evaluate the impact of batch sizes, yield, and switch-over time on the optimal threshold policy.
来源URL: