Ready-time scheduling with stochastic service times
成果类型:
Article
署名作者:
Hodgson, TJ; King, RE; Stanfield, PM
刊物名称:
OPERATIONS RESEARCH
ISSN/ISSBN:
0030-364X
DOI:
10.1287/opre.45.5.779
发表日期:
1997
页码:
779-783
关键词:
摘要:
A frequently encountered scheduling problem is to determine simultaneously a material and job ready time and production sequence based on customer-specified due dates. Each job has a stochastic production time and a deterministic due date. The ready time is constrained in that the probability that each job will be complete by its due date must meet some minimum level of confidence. The objective in such an instance is to postpone the ready time as late as possible without violating these constraints. The steps and effort necessary to determine the maximum ready time and optimal production sequence, and cases in which this effort may be significantly reduced are presented. The resulting model is applied directly to single-facility and flow-shop production environments. Methods are shown for scheduling in a dynamic environment.